This proposal involves the installation of a minimum of two charging stations at one of two locations, as shown in Appendix A. A separate contract will be awarded to Green Mountain Power Co. (GMP). Each selected location will consist of a minimum of two charger locations but the meter for the location will be wired for the capability of powering 4 chargers. A total of 4 pedestals will be constructed and wired for future charger installation per location. The chargers will be ChargePoint CP6021B-80A-L-7-CHIP pedestal mounted units. All installers must be ChargePoint certified installers. The proposed equipment should be identified and justified by providing capacity, efficiency, expected life and warranty data as well as the potential for various local, state and federal rebate opportunities. Technical work description and requirements are contained in Appendix A.