A.3. Monitoring. The Contractor should provide monitoring of stream and wetland mitigation sites as directed by the EMO. Upon receipt of an individual Work Order as described in A.7. of this Contract, the Contractor shall provide all requested services, including but not limited to, the following: a. Collection of SQT data as specified in the 404/401 permits. b. Development of monitoring reports as required by 404/401 permits. c. Conduct TDEC hydrological determinations and USACE stream jurisdictional determinations. d. USACE wetland delineations using appropriate regional supplements e. Vegetation surveys as specified in the 404/401 permits. f. Stream Channel stability analysis for SQT, existing condition score, or as specified in the 404/401 permits . g. Establish permanent monuments for cross-sections, vegetation plots, and photographs. h. Furnish, install, and repair fencing and/or signage. i. Install and maintain monitoring devices and equipment as specified in the 404/401 permits. The Contractor shall conduct soil or water sampling for hazardous materials, biology, water quality, chemistry, and for any other parameters as requested by the State.. The Contractor shall identify samples to be collected in the work order along with references to the SOP that dictates how these samples are to be handled and how data should be reported.