The City of Beaumont requests bids to perform pipe coating tasks at the Cattail Marsh Wetland on the 72-Inch Outfall Pipe. 1.1 Mobilization, including payment bond, performance bond, insurance, moving equipment to project, and demobilization, all in strict conformance with plans and specifications; NOT TO EXCEED 3% OF TOTAL PROJECT BID. (Response required) Quantity: 1 UOM: LS 1.2 Site preparation, all in strict accordance with the plans and specifications. (Response required) Quantity: 1 UOM: LS 1.3 Abrasive blasting, all in strict accordance with the plans and specifications. (Response required) Quantity: 644 UOM: LF 1.4 Primer coating, all in strict accordance with the plans and specifications. (Response required) Quantity: 644 UOM: LF 1.5 Final coating, all in strict accordance with the plans and specifications. (Response required) Quantity: 644 UOM: LF