A. Furnish labor, material, and equipment necessary to install the poured-inplace, resilient surfacing system as shown on the drawings and specified herein. a. Work shall include, but not be limited to the following: layout; excavation; backfill; furnishing and installing of base material; furnishing and installing of poured-in-place, resilient surfacing and all other incidental work to provide a complete resilient surfacing system. b. Poured-in-place playground surfacing shall consist of a polyurethane binder mixed with recycled rubber, which will make up the attenuation cushion layer. The attenuation cushion layer is capped with EPDM, mixed with a polyurethane binder creating the Wear Course. Surfaces shall comply with ADA and CPSC guidelines as well as ASTM Standards. The manufacturer is to be certified by IPEMA, a third- party testing organization for playground surfaces and equipment.