Sealed bids for Stowe Cider Wastewater Pretreatment System Installation, will be received at the Stowe Cider Facility at 17 Town Farm Lane, Stowe, VT until Thursday, October 2, 2025 at 1:00 P.M. local time. After the deadline has passed, bids will be opened and reviewed privately by the Owner. Bids will not be opened and read publicly. The Work includes the following major items: 1. Exploratory Excavation to Characterize Subsurface Conditions. 2. Installation of a duplex submersible wastewater pump station and valve vault. 3. Installation of (4) precast tanks to support an MBR pretreatment process exterior to the Stowe Cider Facility. 4. Installation of vendor supplied equipment inside the dedicated process space, and inside the precast tanks set by the contractor. 5. Installation of gravity and force main piping between the tanks and interior process equipment. 6. Installation of electrical, control systems, and wiring necessary to support the MBR system