New side RTUs: 8 Trane units, all located on the roof (single-story building with flat roof, easy access). Also, on the new side, there is 1 Mitsubishi unit. (outside on the side of the building) Old side RTUs: 4 Trane units, all located on the roof (single-story building with flat roof, easy access). 2 more Trane units, one located outside A-Unit on the ground, and the other unit is outside B-Unit on the ground. 3rd PM, detailed request: Wash/clean all air-cooled condensers, report and deficiencies, clean all blower wheels, and condensate pans. All split loop units and condensers cleaned in June 2026 PM, and generate reports and quote deficiencies. Replace filters each PM with high-performance MERV 8-rated filters and lube as needed. Inspect all HVAC electrical and mechanical components (every PM). Check operation of refrigeration and heating circuits in all equipment (every PM). Clean out drains on all FCU units (every PM). Replace all belts on RTUs and FCUs on June PM 2025.