Remove and return to owner, in same condition, all storm windows. Remove and properly dispose of existing window. Install new vinyl replacement window with half screen to match existing. Contractor to provide all labor and proper materials required for the Project. Contractor shall follow all local and state code regarding proper installation. Contractor to follow project scope, general construction notes, and window details as follows; - REMOVE EXISTING STORM WINDOW, SALVAGE AND RETURN TO OWNER - REMOVE EXISTING INSIDE TRIM STOPS - REMOVE EXISTING TOP AND BOTTOM SASHES - PROVIDE AND PROPERLY INSTALL PARADIGM 8300 SERIES OR EQUAL REPLACEMENT WINDOWS (TO MATCH EXISTING) - PROPERLY WRAP EXPOSED EXTERIOR WOOD WITH .22guage WHITE COIL STOCK FASTENED WITH STAINLESS STEEL WHITE TRIM NAILS.