Mobilization LS 1 Construction Staking LS 1 Develop, Inspect, and Maintain SWPPP LS 1 Erosion Control LS 1 Traffic Control LS 1 Site Clearing & Restoration LS 1 Remove and Replace Aggregate Surfacing on Geogrid, 6-inch SY 27 Remove and Replace Concrete Pavement, 8-inch SY 87 Remove and Replace Bituminous Pavement, 6-inch SY 106 DI Wet Well Piping, 12-inch LS 1 Gravity Sewer Line, 24-inch LS 1 HDPE Force Main, 18-inch LF 2,424 Air Release Valve Assemblies EA 2 Connect to Existing Davis LS Wet Well LS 1 10-ft. Dia. Concrete Wet Well LS 1 Factory-Built Pump Control Station LS 1 Submersible Chopper Pump LS 1 Force Main Outfall Structure LS 1 Electrical Work LS 1 Emergency Stand-by Generator LS 1 Manhole Renovation VF 41 Bypass Pump Piping Assembly L.S. 1