The expansion of Water Plant No. 3 consist of one (1) 1200 GPM gravel wall water well (including test hole, driller’s log, analysis of drill, drift indicator survey, electric log, gas log, water quality sampling, evaluations report, well construction (including multi-stop alignment survey), well development, pumping tests, chemical analysis, well cleaning, disinfection, well pump installation, one(1) 500,000 gallons welded steel ground storage tank, cathodic protection, chemical containment pad with canopy, chemical tanks, chemical feed pumps, chemical piping, site preparation, grading and drainage, paving, yard piping, electrical controls and all necessary appurtenances required for smooth plant operations. Complete in Place.