a. Contractor to remove and properly dispose of all old flooring materials and base in areas as indicated on floor plans, shown on Exhibit “1”. Contractor shall only remove the quantity of flooring that can be replaced every day with new flooring as the facility shall be returned to normal conditions at the end of every workday. b. Contractor to furnish and install new carpet with new cove base, thresholds, and transition strips needed for a complete, turnkey, Americans with Disabilities Act (ADA) compliant system as indicated by floor plans. c. Contractor to furnish and install new carpet with new cove base, thresholds, and transition strips needed for a complete, turnkey, ADA compliant system as indicated by floor plans. d. Any areas with existing tile or concrete (typically bathrooms and stairwells) are excluded from the scope of work. e. Contractor will be responsible for moving the furniture prior to removal of the existing carpet. All furniture shall be placed in its original location after installation of the new carpet. County will be responsible for disconnecting, moving, and reconnecting all computers, printers, and all personal items in the space. f. Contractor to use only Manufacturer approved adhesives, additives, and accessories, and all existing mastics, glue, and adhesives shall be removed prior to new flooring installation. g. Contractor to provide an additional 10% of each flooring type as attic stock to be stored by FMD and used for future repairs.