12 05 50 00.00 Std 8" Diameter Steel Bollards 2 EA $ $ 13 05 50 00.00 Std Armored Expansion Joints, Complete-in-Place, Over Existing Beams 80 LF $ $ 14 05 50 00.00 Std Armored Expansion Joints, Complete-in-Place, without Existing Beams 25 LF $ $ DIVISION 31 - EARTHWORK 15 31 23 00.00 Std Excavation, Stockpile and Dispose of Impacted Material Offsite 50 CY $ $ 16 31 23 00.00 Std Excavate and Disposal of Industrial Site Use Excavation 500 CY $ $ 17 31 23 00.00 Std Select Backfill Material 75 CY $ $ 18 31 23 00.00 Std Reuse (On-Site Excavated Material) 94 CY $ $ 19 31 32 13.16 Std Cement Stabilized Base Repair 300 SY $ $ 20 31 32 13.16 Std Cement Stabilized Sand Fill, 8" Depth 640 SY $ $ 21 31 41 33.00 Std Trench Safety System, 5'-10' Depth 25 LF $ $ 22 31 43 00.00 Add Concrete Raising Polymer 200 CF $ $ DIVISION 32 - EXTERIOR IMPROVEMENTS 23 32 13 13.00 Std Concrete Pavement, 8" Thick (Complete In Place, including joint sealant) 1,100 SY $ $ 24 32 13 13.00 Std Concrete Pavement, 8" Thick, High Early Strenght Concrete, (HES), (Complete In Place, including joint sealant)