1. The Contractor's equipment shall meet OSHA and VOSH standards. The operator shall obey safety rules and regulations and not create any hazardous conditions with the equipment used. All employees shall wear the proper safety equipment while on the work site in accordance with OSHA and VOSH standards. 2. The Contractor shall provide Calcium Chloride, minimum 38% in liquid form, at the proper concentration as indicated in the bid and furnish adequate labor and application equipment to properly apply the solution to the road surfaces. 3. The Contractor shall notify the VDOT designee no less than forty-eight (48) hours prior to delivery of product. 4. The Contractor shall provide a continuous operation once work has commenced. If the Contractor fails to provide a continuous operation, a Procurement Complaint Form may be issued, which may result in default. Reference IX. General Terms and Conditions, paragraph P. DEFAULT.