Peachtree Street Drainage Improvements • Sawcut, demolish existing pavement, and remove existing pavement as show on the plans. • Mill existing pavement to a depth of 2”at the intersection of Peachtree Street and South Street • Approximate milling limits are 105 feet in length and 15 feet in width as indicated on plan sheet 3. • Remove and Re-construct the existing curb and gutter at the connection as indicated on plan sheet 3 to ensure positive drainage along South Street and across the entrance. • Re-grade the roadside ditch between South Street and Miles Circle. • Remove the existing drop inlet on upstream end of pipe at Miles Circle. • Install new 12” ductile iron pipe under Peachtree Street and tie to existing structure on downstream end. • Repave full depth over pipe installation. Harding Street - Temple Avenue Intersection Drainage Improvements • Remove & replace the existing curb and gutter on Harding Street from Temple Avenue to a point down Harding Street. • Mill existing pavement to a depth of 2”. • Approximate milling limits are 150 feet in length and 30 feet wide. • Sawcut, demolish and remove pavement as shown on plan sheet 4. • Install 4 a feet wide concrete flume from the north side to the south side of Harding Street at the intersection with Temple Avenue. Full depth pavement is required to transition the roadway surface to the flume.