Bid improvements consist of open channel canal replacement with large diameter pipeline, road improvements, drainage, earthwork and other work, all in accordance with the contract plans, the contract provisions, and the specifications. The improvements are for construction of water conservation and operational improvements to the KRD system. Requested work follows the existing South Branch Canal alignment starting downstream of the existing pipeline to open channel canal transition at Station 675+94 (MP12.8). The Project improvements in these documents are for pipeline and roadway improvements of existing open channel described as work related to canal improvements for 4,128 feet of pipe between existing canal Station 675+94 (MP12.8) and Station 718+68 (MP13.6).