The project provides for the staged full depth roadway reconstruction and widening of the Pennsylvania Turnpike from 2 lanes in each direction to 3 lanes in each direction and the replacement of 3 mainline bridges. The project includes the removal of three single span multi-beam bridges. The project requires construction of two 1 span composite steel multi-girder bridges, one 1 span composite prestressed spread box beam bridge, and one single cell precast reinforced concrete box pedestrian underpass structure. Additional construction includes 19 retaining walls, 6 stormwater management underground vaults, 15 sound barrier walls, 4 sign structures and 1 arch culvert extension. The contract also provides signing and pavement marking, the Valley Forge Service Plaza entrance ramp, milling and overlaying portions of the Turnpike and side roads, as well as 15 aboveground stormwater basins and other drainage modifications. Work items include, but are not limited to: 680,228 CY Class 1 Excavation 3,968 CY Class 1A Excavation, Various Backfill Materials 28,821 CY Class 2 Excavation 7,927 CY Over-Excavation and Backfilling Under Foundations, Various Backfill Materials 321,641 SY Cement-Treated Subgrade 2,770 SY Cement-Treated Subgrade with No. 2A Coarse Aggregate 22,661 TON Portland Cement, for Cement-Treated Subgrade 268 TON No. 2A Coarse Aggregate, for Cement-Treated Subgrade 348,951 SY Superpave Asphalt Mixture, Base Course, Various Depths 1,358 TON Superpave Asphalt Mixture, Base Course 220,922 SY Rich Bottom Superpave Asphalt Mixture, Base Course, 4” Depth 104 TON Rich Bottom Superpave Asphalt Mixture, Base Course 302,145 SY Stone Matrix Asphalt Mixture, Wearing Course, 2” Depth 167 TON Stone Matrix Asphalt Mixture, Wearing Course 159,102 SY Superpave Asphalt Mixture, Wearing Course, 2” Depth 157 TON Superpave Asphalt Mixture, Wearing Course 348,887 SY Superpave Asphalt Mixture, Binder Course, Various Depths 1,035 TON Superpave Asphalt Mixture, Binder Course 115,875 SY Milling of Asphalt Surfaces, Various Depths 346,472 SY Subbase, Various Depths (No. 2A) 285 TON Subbase (No. 2A) 1,169 TON Subbase Under Guide Rail 220,922 SY Asphalt Treated Permeable Base Course, 4” Depth 35 TON Asphalt Treated Permeable Base Course 53,524 LF Drainage Pipe, Various Sizes and Types 168,914 LF 6” Pavement Base Drain