Collect survey information and provide layout in accordance with the contract. Assume full responsibility for any errors and/or omissions in the work of all engineering staff employed. Provide and have available for the project adequate engineering staff that is: A. Competent and experienced to set lines and grades needed to construct the project. B. Able to perform the work to the scope and magnitude outlined herein. Construction engineering functions and requirements: A. Provide all necessary surveying equipment required for all engineering work on the project. 1. Check all equipment/instruments prior to use on the project. 2. Immediately replace or recalibrate equipment found to be out of adjustment or inadequate to perform its function to the satisfaction of the engineer. B. Perform all computations necessary to establish the exact position of the work from control points and preserve. 1. Maintain adequate workbooks of all computations survey notes and other records. 2. Make available to the Department, neat and legible, all computations, survey notes and other records necessary to accomplish the work. C. Provide preliminary topographic survey for all proposed curb ramp locations identified in the Plans and the layout of grade information required by the engineer for curb ramp construction. D. Obtain topographic information a minimum of 25 feet in each direction from the back of curb at proposed curb ramp locations. 1. Grades for the edge of pavement, gutter line (if applicable), top of curb, front and back edge of sidewalk, existing obstructions such as utility poles, junction wells, traffic poles and cabinets, manholes, valves, fire hydrants, drainage inlets, steps, retaining walls, building faces or other obstructions that are directly adjacent or within the proposed curb ramp limits. 2. Collect data in a format that is compatible with the Departments design standards and submit to the engineer for evaluation of curb ramps that are located in areas with multiple obstructions, limited area, or other unique characteristics that require more detailed layout. The engineer will provide the final grades for construction of these curb ramps....