Furnish all labor, materials, equipment, and incidentals required to construct and install the new 36-inch gravity trunk sewer, associated appurtenances, erosion/sedimentation control, and equipment for the installation of the new sewer main in its entirety as shown on the Drawings and as specified herein. 1. Approximately 4,862 linear feet of 36-inch gravity sewer main, 91 feet of 12- to 24-inch gravity sewer main, 200 feet of 8-inch gravity sewer main, up to 26 manholes, 130 feet 54- inch steel casing installation via Jack and Bore, 942 feet of 54-inch steel casing installation via Jack and Bore or Microtunneling, and all associated fittings, and appurtenances to complete the work. 2. Connections to the existing City of Columbia sewer collection system. 3. Rehabilitation of miscellaneous adjacent manholes and sewer mains via cured in place pipe (CIPP) and slip lining