The Project consists of Installing a Grounding Connection for the Tank, Replacing the Existing Drain Valve, Replacing the Manway Riser, Installing a New Screen on the Overflow Pipe, Detaching and Moving CO/AX on Exterior of Tank, Drilling Additional Weep Holes in the Balcony Floor, Installing a Lockable Ladder Guard on the Exterior Tower Access Ladder, Raising and Cutting the Handrail and Installing Bracing and Swing Gate, Replacing the Shell Manway, Replacing the Interior Bowl Access Ladder, Installing Five (5) Cable Type Ladder Safety Devices, Repairing the Liquid Level Indicator, Replacing the Existing Roof Vent, Removing the Cathodic Protection System, Installing a Safety Grill Over the Riser Pipe Opening, and Shrouding, Abrasive Blasting, and Coating the Interior and Exterior of the Tank. The Project includes an Additive Alternate that consists of Installing a Compliant Exterior Access Ladder, Installing a Compliant Shell-To-Knuckle Roof Access Ladder, and Installing a Handrail and Swing Gate on the Tank Roof.