Contract No. 1 (General Construction) includes, but is not limited to, demolition of existing concrete pads and walkway; demolition of existing stormwater drainage inlets, catch basins, and drainage pipes; removal of existing trees; construction of a 12’ x 16’ equipment building; construction of a paved walkway; construction of a concrete splash pad (excluding installation of parts and equipment); milling and resurfacing of existing paved walkways; installation of stormwater inlets, catch basins, and drainage pipes; installation of a water supply line to 3,000 gallon reservoir tank; installation of a sewer discharge line from 24” diameter x 8’ deep HDPE basin to existing sewer lateral; all earthwork (i.e., trenching and backfilling) associated with installation of electrical components by electrical contractor; all earthwork (i.e., trenching and backfilling) as needed for installation of plumbing components by plumbing contractor; lawn grading and restoration; and other associated work as more fully described on the construction drawings. The General Contractor shall be responsible for developing and coordinating the overall project work schedule among all three prime contractors as well as arranging and managing periodic job progress meetings, as deemed necessary.