Union County Schools will procure services to accomplish the conservation measures through a guaranteed energy, infrastructure optimization contract (Contract). Under the Contract, the selected offeror may be asked to provide all or some of the following: 1. Comprehensive energy, water, and infrastructure optimization services for all of the listed facilities, including the: (a) design, selection and installation of energy, and infrastructure efficient equipment and systems; (b) maintenance and servicing of the installed energy, and infrastructure efficiency measures (Conservation Measures); (c) modification of existing equipment, systems, and/or buildings; (d) revised operations or maintenance procedures to reduce energy costs and the associated operating costs to accomplish the same; (e) possible securing of financing for the transaction; and, (f) energy and infrastructure management training of selected UCSD employees. 2. Structure the terms of Union County School District’s payment obligations for equipment and services on a Performance Contracting basis. Under a performance contract: (a) the successful offeror will guarantee that equipment and services will achieve a predicted level of energy, water, wastewater, and operational savings; (b) UCSD will realize equipment and services without the requirement of major capital funding; (c) UCSD will be able to meet its payment obligations through guaranteed utility and operational savings and, (d) 100% of the savings referenced in 2(c) above will be the sole property of UCSD.