The project will consist of upgrading (4) Well Sites including well head, building, electrical, site work, and abandonment of (1) existing well. Additionally, 4,369 LF of 6-inch PVC C900 raw water main will be installed by open cut, 2,511 LF of 8-inch PVC C900 raw water main will be installed by open cut, 350 LF of 8-inch FPCS C900 raw water main via Horizontal Direction Drill, 50 LF Bore and Jack- 16-inch Steel Casing with 8-inch DIP PC Carrier Pipe including connections to the existing raw water mains, clearing and grubbing, erosion control measures, removal and replacement of asphalt pavement, concrete sidewalks, driveways, curb & gutter, and site restoration. The project will also include the installation of approximately 4,603 LF of 8-inch PVC C900 potable water main by open cut, 80 LF of DIP PC350 potable water main by open cut, 340 LF of 8-inch FPVC C900 potable water main by horizontal directional drill, 320 LF of 16-inch steel casing with 8-inch DIP PC350 potable water main by bore and jack, 5,716 LF of 6-inch PVC C900 potable water main by open cut, 1,105 LF of 6-inch DIP PC350 potable water main by open cut, 72 LF of 4-inch DIP PC350 potable water main by open cut, 81 LF of 2- inch PVC ASTM 2241, SDR21 water main by open cut, and all associated appurtenances, valves, hydrants, and services.