Replace existing PVC Natural Gas mains with approximately 11,500 linear feet of 4 PE coiled pipe and approximately 100 linear feet of 2 PE coiled pipe along Machost Rd. The project also requires the replacement of service pipe totaling approximately 2,700 linear feet of 3/4 PE pipe. Included in the new gas distribution system is the installation of 4 PE ball valves, tracer wire pedestals, and necessary road bores and tie-ins to the existing 4 and 2 gas mains at each end of the replacement. The project also requires service taps and the transfer of approximately 49 existing customers to the new main. The successful bidder will also be required to furnish incidentals such as miscellaneous fittings, tracer wire, detector tape, and provide a pressure test at 90 PSI or 1.5 MAOP on all new piping to establish a turn-key project.