1. Remove the existing roofing, underlayment, and metal edging. Identify and replace any rotted decking and provide a replacement cost per sheet. Remove all project debris and leftover material from job site. 2. Install ice and water shield from the lowest edges of all roof eaves and rake surfaces to a point not less than 24 inches inside the exterior wall line of the building. All valleys should be covered at a Minium of 3’. Tape all seams of plywood per building code. 3. Cover the balance of the roof in a synthetic underlayment. 4. Install white aluminum cap at rake edges and eave edges. 5. Install 50-year architectural GAF shingles (approximately 6,150 square feet). Color should match to exiting roof shingles. Nailing pattern of shingles shall meet CT wind code – 6 nails per shingle. 6. Install all necessary flashing at existing roof penetrations. 7. Install new roof boots on all applicable roof penetrations. 8. Reinstall gutters – existing gutters are staying on building. 9. Provide Town with minimum 5-year installation warranty along with coverage terms. 10. Work can commence upon bid approval. All work needs to be completed no later that May 1st 2026; however, the Town’s preference would be to have the job completed in the Fall of 2025. Please provide estimated start date weather permitting. 11. All bids will be good for 60 days. 12. All bids will require an in-person site walkthrough. Please contact Ed McGrath, Facilities Management, 203-885-3278 to make an appointment. The yellow highlighted area is the impacted roof area.