This project involves the demolition of four (4) properties within the City of Watertown, NY. These structures have been condemned by the City of Watertown and will be demolished with asbestos in place. Addresses and parcel numbers are provided under the Schedule of Properties. Asbestos surveys have been completed for one (1) structure but could not be completed for the other three (3) structures due to the existing poor conditions. It shall be presumed that all building materials with the structures are asbestos containing. A lead survey (TCLP) has been completed for each structure and is available is requested. 1. The demolitions shall be completed with asbestos in place per a site-specific variance prepared by the Demolition Contractor. 2. This is a Prevailing Wage Rate project. Prevailing Wage Rates are applicable. 3. The contractor will be responsible for waste hauling to the DANC/Solid Waste Management Facility, Rodman, NY, and all associated applications / permits. The City of Watertown will provide any required signatures on these forms. 4. The City of Watertown will be responsible for tipping fees. 5. The contractor will apply for a NYS DOL Notification Fee Waiver for the project. 6. The City of Watertown requires a demolition permit for each structure. The contractor shall apply for the demolition permit. Fees for the permit shall be waived by the City.