1.1 The pavement markings shall be performed during the hours of 12:00am midnight to no later than 6am. 1.2 All work shall be performed in a neat and workmanlike manner. The waterborne markings shall be placed on the roadway by means of an approved striping machine. The Contractor shall notify the Public Works Director in writing (10) ten days prior to the time of commencement. The waterborne pavement markings shall have a minimum wet thickness of (15) fifteen mils. 1.3 Any equipment, vehicles or property damaged by the Contractor as a result of faulty workmanship, negligence, or accident will be repaired or replaced at no cost to the Town. 1.4 The Bidder has carefully examined the IFB and understands the scope of work, has become familiar with the local conditions and the character and extent of the work and has carefully examined the contract documents.