3.1 Generally, work will include site preparation, installation of underground plumbing, foundation and pad construction, and building placement. 3.2 Detailed plans, drawings, and specifications are attached. 3.3 Refer to attached documents for quantities, dimensions, locations, and installations methods. 3.4 Contractor shall be responsible for ensuring that the concrete foundation and slab is adequate for the site conditions and the purpose for which the building and foundation/slab are intended. 3.5 All equipment, labor, and trades to unload the building, excavate the site, install the underground plumbing and electrical utilities, build concrete forms, supply and install the reinforced concrete footings and slab, and install the building and fixtures shall be included.