o Provide all required permits and inspections. o Provide all labor and equipment to complete installation of owner provided light bases per RFP, Drawings and Permit Requirements. o Owner provided bases will be Musco brand. Installation of bases must be done to exact specifications provided by Musco that are referenced in the RFP. o Provide materials and all labor to install conduit. Conduit must meet specifications on the issued drawings and must be installed per the plan, on the provided drawings. o Daily Cleanup of all affected work areas, paths of entry, and material delivery or removal thereof, is required. o Contractor shall provide all labor and equipment needed to install (with the exception of owner provided bases) o Contractor will be required to provide a 1-year warranty on workmanship from the substantial completion date. o Contractor will be responsible for completing and submitting Musco provided close-out checklist, inclusive of the required pictures, to the owner. o NO CONDUIT IS TO RUN UNDER FIELDS. ALL CONDUIT AND CONNECTIONS ARE TO BE RUN AROUND PERIMETER OF PLAYING SURFACES.