In total 100 feet in length by 32 feet wide of road, with curbs and gutter and installation of storm water drainpipe. It will start at the end of the state right of way and will go past the entrance of the Eldon Nursing Home. The work to be performed includes 100 feet of roadway in length by 32 feet wide of roadway replacement with 8 inches of concrete, structural Fiber and rebar. On the East side of the road approximately 190 feet of curb and gutter replacement of existing curb to existing curb to match what is currently there. On the West side of the road approximately 100 feet of new curb and gutter including an entry way of the nursing home. All curbs need rebar and inspection by Public Works Directly before pouring of concrete.