Exterior of House 1. Remove and replace to storm doors at front and rear $____________ 2. Remove and replace the front door with new locksets and painted to match and install weather strip $____________ 3. Remove and replace one window in the front $____________ 4. Remove and replace two windows on the left side of the house $____________ 5. Remove and replace three windows in the rear of the house $____________ Living Room 1. Remove and replace wall paneling with drywall, mud, tape and paint $____________ 2. Remove and replace ceiling with gypsum board mud, tape and paint $____________ 3. Paint all new walls and ceiling $____________ Bathroom 1. Replace existing tub with walk-in shower combo with grab bars and new faucet $____________ 2. Install new 50 CFM exhaust fan $____________ 3. Remove and replace sink with vanity and new faucet $____________ 4. Remove and replace toilet $____________ 5. Replace LVT flooring $____________ 6. Remove window in wall and repair to match existing Paneling in bathroom $____________