The work to be done consists of furnishing all materials, equipment, tools, labor, transportation, and incidentals as required by the Plans and Specifications, and contract documents. The general scope of work includes, but is not limited to, rehabilitating various-sized sanitary sewer pipes utilizing trenchless cure-in-place-pipe (CIPP) lining technology on San Gabriel Boulevard (from Angelino Ave to Marshall St). The contractor will also be required to furnish all labor, equipment, materials, tools, and appurtenances to clean and pre-video the sewer pipelines, reinstate all service connections, and post-video the sewer pipelines, which shall include all necessary temporary by-pass pumping system and surface restoration of existing improvements after the required sewer rehabilitation work is completed.