Drawings: Subcontractors have reviewed the most up to date drawings and specifications associated with Kitchen Equipment. This is with awareness that Kitchen Equipment Package 4 is being procured by UGA Dining Services. a. 250403 UGA West Campus DLWC - B2 CA Coordination - HYPERLINKED b. 250403 UGA West Campus DLWC - B2 CA Coordination - Specifications 2. Shop Drawings – This subcontractor shall submit a full set of engineered shop drawings and product data submittals for architect review. This includes but is not limited to calculations, electrical diagrams, and material samples per contract documents. 3. Furnish and Install: Subcontractor shall furnish, fabricate, deliver, store, and install all custom fabricated, and prefabricated food service equipment/ appliances per the contract documents. This includes, but is not limited to, all accessories, connections, etc. that is required to complete this scope of work. 4. Furnish and Install: Furnish and install all trim, sealants, and closures necessary for a complete system. 5. Intentionally left blank 6. Furnish and Install: This subcontractor has included all cost associated with all counter tops and finishes for equipment and custom fabricated items furnished under this scope unless noted otherwise. 9. Coordination: This Subcontractor understands that work shall not be done without approved Drawings, Specifications and/or Modifications and without receiving prior written authorizations from the Owner or Designer. Drawings and equipment specifications are 8. Intentionally left blank.