ingle application may be either 5/8in 3C washed rock or 3/8in washed rock based on the County need. All single applications will follow the guidelines of these specifications found in Section 2and Section 3 of this document. Emulsion supplier must be on the ODOT approved vendor list. Alter the application rate as directed by the County. A certificate of analysis for the oil used is required and 1 gal of emulsion will be provided by bidder for oil testing purposes. MC-30 or AEP Prime Oil - applied at .30 gallons per square yard, 24-36 hours (for MC-30) or 4 hours (for AEP Prime) prior to applying the first bituminous coating. Prime coat shall meet O.D.O.T, 2009 Edition, Standard Specifications for Highway Construction manual, Sec. 408.01 – 408.06. CRS-2- applied at .45 gallons per square yard with 351bs per square yard 5/8in 3C washed rock. CRS-2- applied at .40 gallons per square yard with 281bs per square yard 3/8in washed rock. CRS-2S - applied at .45 gallons per square yard with 351bs per square yard 5/8in 3C washed rock. CRS-2S - applied at .40 gallons per square yard with 281bs per square yard 3/8in washed rock. CRS-2S- applied at 0.45 to 0.55 gallons per square yard with 401bs per square yard 3/4in washed rock...