Mobilization Lump Sum L.S. Clearing and Grubbing Lump Sum L.S. Removal of Bridge @ Sta. 11+95.59 1.0 Unit Unclassified Excavation (F.M.) 1,578.00 Cu. Yd. Muck Excavation (F.M.) 339.00 Cu. Yd. Borrow Excavation (F.M.E.) (Contractor Furnished) (Class 9-6) 626.00 Cu. Yd. Channel Excavation (F.M.) 173.00 Cu. Yd. Temporary Stream Diversion 1.00 Each Granular Material (LVM) (Class 9, Group “B”) 699.00 Cu. Yd. Crushed Stone, Size (825) 213.00 Ton Hot Mix Asphalt, ST, 9.5 mm 123.00 Ton Hot Mix Asphalt, ST, 19 mm 375.00 Ton Filter Material for Filter Beds, Type “A” 610.00 Ton Roadway Construction Surveying Lump Sum L.S. Right-of-Way Markers (Type II) 16.00 Each Maintenance of Traffic Lump Sum L.S. Additional Construction Signs 0.00 Sq. Ft. 4” Wide Thermoplastic Edge Stripe (Continuous White) (60 Mil) 0.218 Mile 4” Wide Thermoplastic Traffic Stripe (Continuous Yellow) (90 Mil) 1,150.00 Lin. Ft. Two-Way Yellow Reflective High Performance Raised Markers 15.00 Each