The Project, of which the Work under the Contract Documents is a part, is generally described as follows. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Water Pollution Control Plant Improvements as shown on the construction drawings and detailed in the specifications. In general, construction consists of installation of a 1.0 MGD package wastewater treatment vessel, influent pumping station, headworks and screening with support structure, blower system, grading, base and pavement, water mains, gravity sewer mains, ultraviolet disinfection system, flow meter, electrical, stand by power unit and all associated appurtenances required to complete project