Req. approx. 5,290 ft2 temp. signs; 10 ea seq. arr. signs; 10 ea PCMS; 1,800 hrs flag.; 8 ea flag. sta. light.; 520 ea TCS; 2,000 ft PCD; 30 ea temp. curb ramps; 500 ft2 temp. walks; 123 ea inlet prot.; 25 ea sed. barr.; 413 ton contam. soil disp.; 200 ea soil smpl. test.; const. surv. wrk.; 8,600 yd2 rem. surf. curb ramp const.; 8,800 ft asph. pvmt. sawcut.; 2,000 ft conc. sawcut.; 14 ea adj. box.; 79 ea adj. inlet; 3 ea adj. M.H.; 2,250 yd2 CPPR; 3,400 ton aggr. base; 1,200 ton ACP; 510 ft2 asph. sl. pav.; 14,000 ft2 pvmt. rep.; 40 yd2 pl. conc. pvmt. rep.; 10,000 ft conc. curbs; 290 ft2 conc. drwy.; 45,000 ft2 conc. walks; 2,874 ft2 trunc. domes; 16 ft thero. striping; 2 ea xwalk. clos. sup.; rem. & reinstall. etxg. signs; 185 fbm wood sign pt.; 6.1 yd3 conc. in sign sup.; 2,505 st. in sign sup.; 108 ft2 signs; 4 ea traf. sig. mod.; 0.3 acre seeding; 85 yd3 topsoil; 50 yd3 brk. mulch; 250 ft2 geot.; 20 ft mtl. rail; 4 ea rem. & reinstall. bike racks; 1 ea reem. & reinstall. nwsppr. bins.