The project includes upgrading the existing manual screen to an automated screen; upgrading existing pond aerators; duplex influent pumps and pump station with building; an oxidation ditch; two secondary clarifiers; flocculation tank; disc filters; UV disinfection; Parshall flume; plant drain pump station; WAS/RAS pumps; an aerobic digester with steel tank; dewatering/electrical building with rotary press; upgrades and expansion of existing control building; new chemical building; electrical work; yard piping; demolition of existing buildings, pond appurtenances, utilities, fences, and other areas as shown; SCADA system; and miscellaneous other work and improvements necessary to complete the work as described in the Contract Documents and Contract Drawings.