The project consists of an interior renovation of the existing building. The restrooms will have updated finishes and the mens side will include the demolition and reconstruction of new showers and drying areas and adding an ADA accessible shower. The project includes repurposing space for a new lactation room and relocating the IT function from a mechanical room to a dedicated IT room. New blast-rated storefront and windows are provided on the ground floor. New clerestory windows are provided in the drill hall. All doors throughout the building are to be replaced with new doors, frames, and new door hardware. Interior finishes include new ceilings, wall paint, and flooring. New resinous flooring, carpet, and polished concrete will be included. Installation of OCIE storage lockers is included in the project. MEP scope of this project includes major renovations of the building systems. Replacing plumbing DWV and water line piping as well as replacing plumbing fixtures. All HVAC systems and related infrastructure are to be replaced. Lighting will be replaced with new LED, electrical distribution systems modified to accommodate new layouts and equipment, and the life safety systems will be replaced.