1. Demolition and disposal of select materials including but not limited to: block walls on main level on Washington St, flooring on main level, ceilings, roof structure, and all debris from the building. Not included is any foundation system including crawlspace walls, basement walls, footings, piers and basement floors. Those are to be preserved for future use. There may be other hazardous materials (beyond ACM) present at the site. All debris must be hauled to the Marquette County Landfill, no exceptions. Items that are able to be recycled is acceptable. Please refer to Exhibit E for State Land Bank Authority grant requirements, since this is a grant funded demolition. Prevailing wage is not required for this demolition work. Please refer to the Asbestos Survey results which will be provided by the Owner at a later date as Exhibit C. You must acknowledge the document and sign that you have reviewed prior to bid award date. Please include in your bid the cost to properly dispose of any other hazardous materials. Include in your bid: 2. Hauling all material to an appropriate landfill. Copies of landfill tickets are required. Bid is to include landfill fees. 3. All utilities shall be terminated and/or plugged in accordance with the applicable rules, codes and standard practices. Any permits or fees for utility termination shall be paid for by the Owner. Utility disconnections must be in writing and provided to the Authority prior to work commencing. 4. If additional debris is present on the site, removal of additional debris should be included in the bid estimate. 5. Asphalt on vacant lot on street level shall not be removed from the site. 6. It is expected that water will be used to control dust emissions throughout the demolition process. An inspection and photo of the completed selective demo will be required by Marquette County Land Bank. 7. This project is being funded with funds per State Land Bank Authority Grant Agreement # SLBA-00331. Certain documentation may be required per the grant requirements attached as Exhibit E. 8. Fencing, weather protection post-demo, and temporary fencing are the responsibility of the owner. If temporary flooring is needed please include in price.