HVAC Replacements at Operation Center; Location of Work: • Stormwater & Facilities Building – 245 Operation Center Drive – (3) Split Heat Pumps • Stormwater Admin Building – 209 Coleman Dr. – (4) Split Heat Pumps • Streets Building – 265 Operation Center Drive – (2) Split Heat Pumps; HVAC Replacements at Operation Center Location of Work: • Stormwater & Facilities Building – 245 Operation Center Drive – (3) Split Heat Pumps • Stormwater Admin Building – 209 Coleman Dr. – (4) Split Heat Pumps • Streets Building – 265 Operation Center Drive – (2) Split Heat Pumps The City of Wilmington is seeking proposals from qualified vendors for the replacement of HVAC systems at the locations shown above. The City Operations Center was built in 2005/2006, and the HVAC systems are original to the complex, approximately 20 years. The selected professional will be required to provide all documentation necessary for permitting, removing, and replacing portions of the HVAC systems. Documentation for eligible Duke Rebates shall also be included with the bids.