The overall project will consist of five phases. Phase One: (a) Site preparation and (b) construction of the pavilion. Phase Two: Installation of restrooms and prep kitchen. Phase Three: Site work and development of a riverwalk. Phase Four: Installation of sectional doors. Phase Five: Asphalt parking lot. Phase One site preparation (a) will be completed by the Town of Tazewell and should not be included in the submitted proposal. This will include removing part of the concrete slab that is not feasible for use, clearing the site of brush and trees and leveling the site. The construction of the pavilion (b) to be completed by the awardee and the proposal must include the full costs of its materials and construction costs. We can provide conceptual drawings received from design firm Dialogue and Design, upon request. Add Alternate: Phase Two of the project includes installation of restrooms and prep kitchen. Respondents must include materials and construction costs for Phase two in their proposal separately. The Town of Tazewell will perform required work to furnish water and sewer taps and install corresponding service lines. All other work related to Phase Two would be completed by the respondent. Two restrooms will be needed. Each of the two restrooms should be comprised of two separate stalls and must meet ADA requirements. The prep kitchen will consist of countertops, sink, and electrical outlets. We anticipate the size of the two restrooms and prep kitchen to be approximately 20 x 40. Phase Three, Phase Four, and Phase Five are not to be included in the proposal and are provided for informational purposes only.