1 EARTH EXCAVATION (SOIL TO CCDD FACILITY) 1,100 Cubic Yard 2 EARTH EXCAVATION (SOIL TO LANDFILL) 5,200 Cubic Yard 3 PAVEMENT REMOVAL 16,000 Cubic Yard 4 DRIVEWAY AND ALLEY RETURN PAVEMENT REMOVAL 17,000 Square Yard 5 CURB REMOVAL 19,000 Square Yard 6 COMBINATION CURB AND GUTTER REMOVAL 84,000 Foot 7 SIDEWALK REMOVAL 620,000 Foot 8 ALLEY PAVEMENT REMOVAL 36,000 Square Foot 9 GARAGE APRON REMOVAL 12,000 Square Yard 10 HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH 20,000 Square Foot 11 POROUS GRANULAR EMBANKMENT, SUBGRADE 100 Square Yard 12 SUB-BASE GRANULAR MATERIAL, TYPE B 12,000 Cubic Yard 13 TRENCH BACKFILL 1,500 Cubic Yard 14 PERVIOUS AGGREGATE SUBBASE 3,600 Cubic Yard 15 BEDDING & VOID OPENING AGGREGATES FOR PERMEABLE PAVERS 200 Cubic Yard 16 CRUSHED STonE (TEMPORARY USE) 200 Cubic Yard 17 PORTLAND CEMENT CONCRETE BASE 7,500 Ton...