Yakima County Project Number FC 3764: South Fork Tieton River Fish Passage Project. The work to be performed under this Contract involves a side channel excavation to connect the South Fork Tieton River and Rimrock Lake and bridge construction with earth structures following the channel work. The following major items of work and other associated items of work are detailed in the contract plans and specifications: Project FC 3764; Roadway Excavation Incl. Haul 490 C.Y. Controlled Blasting of Rock Face 4,600 L.F. Channel Excavation, Incl. Haul 32,200 C.Y. Structure Excavation CL A, Incl. Haul 2,490 C.Y. Structure Excavation CL B, Incl. Haul 326 C.Y. Structural Earth Wall 6,590 S.F. Superstructure – Tieton Reservoir Road Bridge 1 L.S.