Bidder agrees to install all materials provide by the Owner and furnish all other required materials, and furnish all equipment and perform all labor necessary to construct the proposed raw water line tie in at the water treatment plant as shown on the Drawings or as specified herein. More specifically, the work shall include, but not be limited to, installation of a meter vault, pressure sustaining valve vault, coring of the raw water pump station, and electrical and SCADA work. The work also includes earthwork, site work, ±800 LF of 16” Class 350 ductile iron raw water main, yard piping, erosion and sediment control measures, grassing, construction staking, mobilization/demobilization, bonds, insurance, delivery of materials, take offs, and all other appurtenances and efforts required for completion of the work shown on the Drawings and as specified.