The successful respondent and the District will enter into an Agreement for Construction Services per the District’s standard terms and conditions as provided in the attached sample Agreement. Proposers are encouraged to ask questions or request clarifications regarding the Agreement during the RFB process; the District does not intend to negotiate the Agreement’s standard terms and conditions after recommendation of award is made. Any exceptions to the terms of the Agreement must be noted in the proposal. The bids shall include the minimum requirements stated in this RFB The scope of work shall include, but not necessarily be limited to, the following. Both locations should include like finishes. East End; 500 Marginal Way Portland, ME 04101 Demo items currently in locker room (see drawings). Prep and paint floors with 2-part epoxy, walls, miscellaneous piping, doors and trim (all paint must be approved by PWD). Replace lockers with similar style and quantity (alternate option to refinish current lockers). Provide paper towel holders, soap dispensers and toilet paper holders to be installed by the contractor. And approved by PWD. All miscellanies electrical and plumbing directly associated with the project. LED Panels in each pod with dimmer switch LED Panels in locker room area with dimmer switch Any Fire code devices determined required will be installed by Johnson Controls at the contractor’s cost. Install an exhaust fan system for the locker room. Exhaust fans should be provided in each pod restroom in addition to the locker room. All sinks and toilets shall be touchless. Install new bench seating in the locker room area. There will be three pod style restrooms (see drawings) Contractor shall provide a minimum of two temporary showers.