A complete remodel of the interior and exterior of the Rohovec building. Selective demolition of building systems, fixtures, and finishes. Interior space reconfiguration to include the main audience seating area. New ramps and handrails for accessibility. Installation of new finishes for floors, walls, and ceilings. Mechanical system replacement and upgrades. Plumbing system upgrades to include new fixtures. Installation of a new fire sprinkler system. Electrical system replacement and upgrades· special systems replacement and upgrades-a new audio/visual systems and associated equipment. Exterior upgrades to include structural upgrades, installation of new exterior windows at new locations. Roof removal and replacement. Repairs and re-coating of existing exterior stucco system.