The Contractor’s lump sum proposal shall include all materials, equipment, labor, and incidentals necessary to complete the project in its entirety. This includes, but is not limited to, the following responsibilities: • Maintaining a clean and safe job site at all times. • Providing all required labor (including subcontractors, where permitted), tools, equipment, and transportation. • Supplying and maintaining dumpsters, and ensuring proper disposal and recycling of all waste in accordance with applicable regulations. • Preparing and submitting all necessary engineering and architectural drawings, plans, and technical specifications. • Obtaining all required permits and licenses, including coordinating with Sunshine 811 for utility locates. • Installing appropriate construction safety measures such as fencing, privacy screens, and traffic cones. • Restoring any disturbed sod, landscaping, and grading to original condition or better. • Performing daily site cleanup and ensuring all safety precautions remain in place after work hours. • Coordinating with other City contractors, subcontractors, and utility providers (e.g., power, gas, water). • Managing traffic control as needed, including the use of off-duty City police officers when required. • Providing as-built drawings and all documentation required for project closeout. • Installing straw or hay bale barriers around yard drains to prevent sediment from entering existing catch basins.