The Village will procure and provide ChargePoint brand EV chargers - (1) CPE250 DC 62.5 KW Charger and two (2) CP6021B 80A level 2 chargers as specified in the provided drawing package detailed in Attachment C. The Contractor will provide the necessary labor and materials to provide “Make Ready” sites for the above listed equipment as specified in the provided site drawings and ChargePoint installation specifications. This includes all excavation work, foundation work, underground piping & wiring, backfilling with stone, providing and installing the specified transformer for the level 2 chargers, and all required electrical work and wiring. Upon completion of this work, the Contractor will test all electrical feeds and coordinate with the Village and ChargePoint to arrange for the installation of the EV Chargers.