The construction work, in general, consists of furnishing and installing the "Wasatch County Water Efficiency Project – Wasatch Canal Lining – Fitzgerald to Coyote Reach", including the installation of the 2565 linear feet of 10-foot wide, 3.5-foot tall cast-in-place concrete lining, two access ramps, toe drains, a ground water recharge turnout, along with 2750 linear feet of 6-inch thick by 12-foot wide finished width untreated base course access road. Also, included in this project is an access ramp in an existing section of the concrete-lined Wasatch Canal at Center Street and an alternative addition for a replacement screening structure at Station 154+05. SITE OF WORK: The work site is in Heber City, Wasatch County, Utah at the end of the existing concrete canal lining on the Wasatch Canal north of Fitzgerald Road (Station 154+50) and extending to an existing concrete canal lining at Coyote Parkway (Station 184+00) and an access ramp located just north of Center Street.