Pickens County is soliciting bids from qualified general contractors for the replacement and upgrade of electrical and water infrastructure at Mile Creek Park Campground. Work will also include asphalt restoration in areas impacted by construction. . Electrical System Upgrades The electrical scope includes the complete replacement of the existing power distribution system for Phase 1 (Campsites #1-#23), with the following requirements: 1. RV Service Pedestals o Install new all-in-one service pedestals (TescoFlex or equivalent) with integral metering and circuit breakers at each campsite. o Each pedestal must provide: 50A (NEMA 14-50R) 30A (NEMA TT-30R) 20A GFCI duplex outlet (NEMA 5-20R) o Upgrade each campsite to 50A service. 2. Distribution & Feeders o Install combinations of 400A service pedestals, with some serving bathhouses (comfort stations). o Size all feeders per NEC demand factors and distance: <185 ft: #1 aluminum 185-250 ft: #1/0 aluminum 250-300 ft: #2/0 aluminum 300-350 ft: #3/0 aluminum 350 ft: #4/0 aluminum • Provide new feeders to comfort station (~250 kcmil aluminum)...