Specific Scopes of Work include, but not limited to the following: 1. A new Post-Security Connector connecting Terminal A to Terminal B between gates A11 and B1 2. The modifications of the existing public connector between Terminals A and B to become part of the Post-Security Connector 3. A new Upper Level public connector, connecting a portion of the existing public connector to Terminal B 4. New vertical circulation at Terminal B from the Upper Level public connector down to both the Departures and Arrivals Levels 5. Modifications to the Terminal B Gate B1-B3 Holdrooms to integrate the new Post-Security Connector 6. Renovations to existing facilities 7. Creation of a new shadow space 8. The relocation of Gate A11, including the PBB, fuel pit, and striping, with a new fixed walk segment 9. Creation of two new Automatic Exit Lanes at Terminal A 10. Modifications to the existing A3 Checkpoint to accommodate the new Automatic Exit Lanes 11. The project will also include the improvement of the vertical circulation at Terminal A Satellite between level 1 and departure levels. This part of the project is still under conceptual design.